---
title: "Every one of ETH Zurich’s 100+ printers was built by a student"
description: "ETH Zurich's architecture department trains over 300 students a term in 3D printing. "
url: "https://www.prusa3d.com/p/case-studies/education/eth-zurich/"
lang: "en"
---

Education

> # “I can’t imagine a world without 3D printing. **It just wouldn’t work!**”

 Jonathan Benhamu Founder of HYTAC and lecturer at ETH Zurich

ETH Zurich

![ETH Zurich logo](https://assets.prusa3d.com/cdn-cgi/image/width=120,height=24,quality=85,format=auto/https://storage.googleapis.com/prusa3d-content-prod-14e8-asset-manager-prod/e79c8c1a-0a43-479b-bb1a-ee58de27c33c.png)

## ETH Zurich case study in numbers

**ETH Zurich** is one of the world's leading universities in science and technology. In its Department of Architecture, the Hybrid Timed Architecture (HYTAC) programme runs 100+ Original Prusa 3D printers to turn architectural designs into reality.

-   **1855** year founded
-   **25,000** total students enrolled
-   **100+** Original Prusa 3D printers

300+ students trained per term

During their first week, over **300 architecture students** are divided into groups to learn CAD, slicing, and 3D printing.

## From the first week to a grand exhibition

1.  Problem For many of the **300+ architecture students**, this is a rapid immersion. They must quickly learn how to design, slice, and print to benefit their daily workflow.
2.  Solution Through hands on learning via the "3D Jony" platform and classroom exercises, the HYTAC program gets students up to speed immediately, dividing tasks between CAD drawing, model preparation, and machine assembly.
3.  Value By the end of the week, the students are successfully printing their own models, and everything culminates in a large exhibition showcasing their new skills.
    
    “I saw all these models, which I found really interesting, and I wondered how they were made in just one week. And that was thanks to 3D printing.”
    
    Jonas Jost, first year architecture student 

![Jonathan Benhamu leaning over an Original Prusa printer beside a student, printed model pieces on the table](https://assets.prusa3d.com/cdn-cgi/image/width=1200,quality=85,format=auto/fee5aeef-9c83-4d71-96a2-ed1125639dbd.jpg)

## Building the machines they learn on

1.  Problem Integrating 3D printing into an architectural curriculum requires students to deeply understand the tools they use rather than treating them as a black box.
2.  Solution Students meet the machines **in their first week**. Over 300 architecture students are divided into groups and tasked with assembling an Original Prusa 3D printer kit, which has to be completed in two days.
3.  Value Through assembly, design, and slicing, the students bridge the gap between theoretical research and practical applications.
    
    “In the end, every 3D printer we have, has been built by our students so it has the added value of them knowing how it works and being able to fix it themselves.”
    
    Jonathan Benhamu, lecturer at ETH Zurich 

![A student screwing together a stepper motor at a studio table, with printer frame parts beside her](https://assets.prusa3d.com/cdn-cgi/image/width=1200,quality=85,format=auto/84140e90-92df-4f75-9955-9330b5c0cd58.jpg)

## A neighbourhood of Barcelona, printed at model scale

1.  Problem Students need to master key architectural principles: modeling in CAD software, analyzing context, scaling, detailing, and organizing a massive cooperative workflow.
2.  Solution The students modeled **El Poblenou**, a popular part of Barcelona featuring the Torre Agbar and Bogatell beach. They turned a 2D analysis into a large scale 3D model using ArchiCAD and printed it over several weeks. Printed on [Original Prusa MK4S](https://www.prusa3d.com/product/original-prusa-mk4s/)
3.  Value The impressive final model **fills up an entire showroom**.

![A very large white printed city model filling a room, with a crowd of students standing around it](https://assets.prusa3d.com/cdn-cgi/image/width=1200,quality=85,format=auto/d810ddb8-1603-4821-9525-2da43e48b7c8.jpg)

## A lab on the roof built for 100 printers

1.  Problem Operating a fleet of over 100 3D printers safely in a university environment requires strict measures for fire safety, ventilation, and air filtration.
2.  Solution Set up in collaboration with Professor Andrea Deplazes, the 3D lab is located inside a specially developed high tech container on the roof of the architecture department. All 3D printers are housed in a temperature controlled and well ventilated room, safely stored behind glass doors.
3.  Value To ensure their 3D printing lab is always up to date, **HYTAC sells 20 of its printers to the students at a reduced price every year and replaces them with 20 brand new ones**.

![A narrow lab corridor lined floor to ceiling with printers behind glass doors and white filament spools](https://assets.prusa3d.com/cdn-cgi/image/width=1200,quality=85,format=auto/aab27c72-8adf-4c76-a299-85e418779b7b.jpg)

## Could your students build the machines they learn on?

Tell us what you teach. We will come back with the machines, the materials and the way other faculties set their labs up.

-   Free, no commitment, quick answer from our sales team

## Still not sure where 3D printing fits your production?

See what other organizations print: an architecture studio, a collider, a hangar, a car plant, a trauma center.

[Browse all stories by industry or application](https://www.prusa3d.com/p/case-studies/)

![MASSLAB prints master plans clients can rearrange](https://assets.prusa3d.com/cdn-cgi/image/width=1200,quality=85,format=auto/55de4add-6846-4587-9334-31964440797a.png)

Customer story MASSLAB

## MASSLAB prints master plans clients can rearrange

The 40 person Porto architecture studio has printed nearly all of its models since 2021. Buildings, parks and terrain come out as separate swappable pieces, so a roofline changes during the meeting instead of after it.

-   **40** people in Porto
-   **2021** nearly all model making printed since
-   **2** dual head Original Prusa XL printers

> “MASSLAB models buildings, parks and terrain as individually swappable printed pieces, so a master plan can be rebuilt on the table instead of remade.”

 Catarina Calçada Gaspar Architect and Communication Manager

![MASSLAB logo](https://assets.prusa3d.com/cdn-cgi/image/width=200,quality=85,format=auto/https://storage.googleapis.com/prusa3d-content-prod-14e8-asset-manager-prod/a8edefc5-e4c9-4ca9-9e2f-8832acb19696.png)

1 / 4

## Your team’s questions, answered

What educators and technical staff usually ask when scaling up.

### Curriculum & Training

Student onboarding

### How quickly do students learn to use the printers?

### What materials are used for architectural models?

### Lab Setup & Safety

Facility requirements

### How do you safely run over 100 printers in a university?

### Fleet Management

Upkeep and lifecycle

### How is the 3D printer fleet kept up to date?
